1.Main body: selected standard HPB59-1 high quality brass, red stamping forging, integrated molding, using the world’s most advanced CNC automatic processing center refined from.
2.Panel: Thickened design, 70 years of use does not collapse, real material, fine carving grinding, inner edge finishing, so that the panel and the main body tightly, all round chamfer design, make the product more rounded take do not cut hands, hollow proportion of 50% design, rapid drainage and can effectively filter hair and other sundry.
3.Floor drain core: the use of aviation grade ABS material, mechanical gravity drainage, the use of reverse gravity balance principle, to solve the water seal floor drain easy to block drainage slow, spring magnetic suction floor drain long easy to failure and other technical problems. Filter and core integrated design, easy to clean, easy to install, large displacement, faster drainage, displacement up to 40L/min
1.Item number:———————————-DL10-30F-02
2.Raw material :———————————— GB-HPB59-1 Brass;
3. Size:————————————————-100mm*300mm
4.Place of Origin:———————————Zhejiang, China
5.Model No:—————————————DL10-30F-02
6.Surface treatment:—————————Chrome plate,polished
7.Color: ——————————————-Chrome,Golden ,nickel, bronze
8.Water flow rate:——————————36L/min-40L/min
9.Delivery time:——————————–about 30days
10.Export Port:———————————-Ningbo. Shanghai
11.weight: ————————————–1700g
Q1.How long is your normal product delivery time?
A:It usually take 30 days to go.
Q2:How to maintain floor drain?
1)Use a brush, preferably not plastic, which can splash water and stain your clothes.
2)You can dissolve soda and hot water at 1:30 and keep the water temperature at 55 degrees Celsius until it gets hot
3)You can use the dissolved hot alkali water to fall down the floor drain, pay attention to not too fast when pouring, but the amount of water should be large, so as to play the role of scouring, in order to wash down the debris of the pipe wall.
Q3:How long does the mold development of your company take?
A:According to the drawings provided by the customer, it can be completed in 1-2 months